Upstairs Bathroom
_______________________________________________
December 13, 2008


After finishing the exterior of the dormer we worked on the inside. We hung the backerboard for the tiles around the tub/shower, plumbed the shower, and hung the drywall.






Plumbing for the bathtub and shower in the wall before hanging
the drywall.



Cement backerboard around the tub to support the tiles which
we'll install later.



Drywall up on the wall that will have the sink and toilet.



And the other side of the wall in the picture above where we
extended the bathroom into the bedroom a little.